MTO Manufacturing Procedure
Our approval drawing-based MTO process eliminates ambiguity and ensures every part meets your exact specifications.
RFQ Receipt & Drawing Review
We review the RFQ, drawings, material specifications, quantities, and delivery requirements to identify the manufacturing scope and points requiring clarification.
Technical Clarification & RFI
When information is missing or unclear, we issue an RFI and coordinate the technical details with the customer before the production plan is finalized.
Approval Drawing Submission
Approval drawings are submitted with the agreed dimensions, interfaces, material requirements, and revision information for customer review.
Production & ITP Execution
Manufacturing proceeds from the approved drawings. Project requirements guide in-process inspection, material verification, dimensional checks, and required quality records.
Document Package Compilation
Quality and delivery documents are prepared to the agreed project requirements, including inspection records and packing information required for shipment.
Export Packing & Shipment
Products are packed for their transport conditions, with protection, labeling, and shipping documentation prepared in line with the agreed export terms.
