Systematic Quality Management Based on Inspection & Test Plan (ITP)
SEATECH applies an Inspection & Test Plan (ITP) at each manufacturing stage to manage key quality requirements. Depending on project specifications, dimensional inspection, material verification, NDT, hardness testing, and hydrostatic tests are performed and documented.
ITP Gate Process
Data Receipt
Review / RFI
Approval Confirmed
Material Incoming
In-Process Inspection
Final Inspection
Document Package
Dispatch
Inspection Items
Dimensional & Visual Inspection
CTQ (Critical-to-Quality) dimensional measurement
Assembly interface tolerance & surface roughness
Visual Inspection
Material & Mechanical Properties
Chemical composition analysis (Spectrometer)
Mechanical properties (Tensile / Yield / Elongation)
Hardness testing (HRC / HB)
Special Inspection (NDT / Balancing)
Non-destructive testing (RT / UT / MT / PT)
Dynamic Balancing (ISO 1940)
Hydrostatic Test (Hydro Test)
Witness Inspection Support
On RequestWitness inspection by the customer or a third-party inspection agency (TPI) is available. This will be reflected in the ITP upon request.